Problem Summary


Production order not exploding BOM for LC5950 800 and above sizes.

Admin Info


Purpose
ReCap Ticket Summary
Requested by
Babu Lankipalli
Issue Date
02-05-2014
Resolved by
Adithya Vojjal
Resolved Date
02-05-2014
Document Status
Complete

Detailed Problem Description

(Include Screen Shots if required )

BOM Explosion especially Cut Pieces are not Exploded in the Production Order # 1000660956

Solution Analysis and Recommendations

(Include Screen Shots if required)

Investigated the Reason for which cut pieces which are not exploded in the production order. The component explosion issue is only for the Grids 800 and above, as Quantity distribution is not maintained for those grids in the Quantity distribution Profile.
We may not be able to change the Quantity Distribution Profile (add distribution to Grids Above 800) as those profiles are already assigned to the existing BOMs

Resolution


We may have to create a new Distribution Profile similar to the existing ones and replace it. Informed to NEC

Release Information